Four rules that came out of costs already paid in the field. They are working constraints, not statements of intent.
Commissioning is where responsibility starts
Drawings, proposals and reports are intermediate products. The work is finished when the system runs in place — and stays finished only as long as it keeps running.
No complexity without a reason
Every additional component is maintenance debt someone pays later. If the simple option covers the requirement, the impressive one is not chosen.
No change without a way back
Anything that touches a live system has a backup and a single-command return path before it is applied. Preparation, not courage.
Measured before it is claimed
Performance, capacity and recovery times are stated only where they have been observed. An untested assumption is documented as an assumption.
Problem types
Where the rules came from
Each rule exists because one of these situations was handled badly at least once.
A production line that has to keep running while its network is rebuilt underneath it.
A facility reachable only through carrier NAT that still needs maintenance access without a truck roll.
Operational data that never leaves the machine it was measured on, because nothing was built to carry it out.
A service with a nightly backup that has never once been restored, so nobody knows whether it works.
An installation where each vendor owns one layer and no one owns the system.